CC215S Rmp US95N over Sky Pointe Drive

Centennial Bowl · County 003, Nevada · Built 2022 · 1 Lanes · 5,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
H3036
Year Built
2022
Length
125 m (410.1 ft)
Max Span
64 m
Width
9.4 m (30.8 ft)
Lanes
1
Daily Traffic
5,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.