MSAS 241 over I 35W
1.2 MI S OF JCT TH 94 · County 053, Minnesota · Built 2018 · 3 Lanes · 7,500 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
44.951953, -93.273317
This bridge is in worse condition than 9.4% of bridges in County 053. The average bridge in Minnesota is 0 years old; this one is 8 years old.
Nearby Bridges
I 35W over MIDTOWN GREENWAY TRAIL
Built 2021
I 35W over MIDTOWN GREENWAY TRAIL
Built 2019
CON 711 over MIDTOWN GREENWAY
Built 2021
M 2427 over MIDTOWN GREENWAY
Built 1914
MSAS 211 over MIDTOWN GREENWAY
Built 1997
MSAS 190 over MIDTOWN GREENWAY
Built 2024
MSAS 430 over MIDTOWN GREENWAY
Built 1914
I 35W over E. LAKE ST
Built 2021
BRT over E LAKE ST
Built 2021
I 35W over E. LAKE ST
Built 2019
Bridge Details
- Structure #
- 27W02
- Year Built
- 2018
- Length
- 76.8 m (252 ft)
- Max Span
- 40.2 m
- Width
- 20.4 m (66.9 ft)
- Lanes
- 3
- Daily Traffic
- 7,500
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.