M 2427 over MIDTOWN GREENWAY

0.1 MI N OF LAKE ST · County 053, Minnesota · Built 1914 · 2 Lanes · 5,213 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
L8910
Year Built
1914
Length
28.7 m (94.2 ft)
Max Span
9.6 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
5,213
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$730,000,000
Total Project Cost
$427,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.