MSAS 190 over MIDTOWN GREENWAY
0.1 MI N OF LAKE ST · County 053, Minnesota · Built 2024 · 2 Lanes · 8,600 vehicles/day
Overall
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
44.950369, -93.276625
This bridge is in worse condition than 9.4% of bridges in County 053. The average bridge in Minnesota is 0 years old; this one is 2 years old.
Nearby Bridges
M 2427 over MIDTOWN GREENWAY
Built 1914
MSAS 430 over MIDTOWN GREENWAY
Built 1914
CON 711 over MIDTOWN GREENWAY
Built 2021
I 35W over MIDTOWN GREENWAY TRAIL
Built 2019
I 35W over MIDTOWN GREENWAY TRAIL
Built 2021
MSAS 158 over MIDTOWN GREENWAY
Built 1982
I 35W over E. LAKE ST
Built 2019
BRT over E LAKE ST
Built 2021
I 35W over E. LAKE ST
Built 2021
MSAS 241 over I 35W
Built 2018
Bridge Details
- Structure #
- 27C75
- Year Built
- 2024
- Length
- 28.7 m (94.2 ft)
- Max Span
- 10.4 m
- Width
- 15.4 m (50.5 ft)
- Lanes
- 2
- Daily Traffic
- 8,600
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.