MSAS 190 over MIDTOWN GREENWAY

0.1 MI N OF LAKE ST · County 053, Minnesota · Built 2024 · 2 Lanes · 8,600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
27C75
Year Built
2024
Length
28.7 m (94.2 ft)
Max Span
10.4 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
8,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.