MSAS 430 over MIDTOWN GREENWAY
0.1 MI N OF LAKE ST · County 053, Minnesota · Built 1914 · 4 Lanes · 8,600 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
3
Serious
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 3 | Serious |
| Substructure | 4 | Poor |
Location
44.950267, -93.277919
This bridge is in worse condition than 99.7% of bridges in County 053. The average bridge in Minnesota is 0 years old; this one is 112 years old.
Nearby Bridges
MSAS 190 over MIDTOWN GREENWAY
Built 2024
MSAS 158 over MIDTOWN GREENWAY
Built 1982
M 2427 over MIDTOWN GREENWAY
Built 1914
CON 711 over MIDTOWN GREENWAY
Built 2021
M 2008 over MIDTOWN GREENWAY
Built 1914
I 35W over MIDTOWN GREENWAY TRAIL
Built 2019
I 35W over MIDTOWN GREENWAY TRAIL
Built 2021
I 35W over E. LAKE ST
Built 2019
BRT over E LAKE ST
Built 2021
I 35W over E. LAKE ST
Built 2021
Bridge Details
- Structure #
- 90590
- Year Built
- 1914
- Length
- 28.8 m (94.5 ft)
- Max Span
- 10.7 m
- Width
- 25.3 m (83 ft)
- Lanes
- 4
- Daily Traffic
- 8,600
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $747,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.