I 35W over MIDTOWN GREENWAY TRAIL
1.3 MI S OF JCT TH 94 · County 053, Minnesota · Built 2021 · 5 Lanes · 76,673 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
44.9504, -93.2744
This bridge is in worse condition than 9.4% of bridges in County 053. The average bridge in Minnesota is 0 years old; this one is 5 years old.
Nearby Bridges
I 35W over MIDTOWN GREENWAY TRAIL
Built 2019
CON 711 over MIDTOWN GREENWAY
Built 2021
M 2427 over MIDTOWN GREENWAY
Built 1914
MSAS 190 over MIDTOWN GREENWAY
Built 2024
MSAS 241 over I 35W
Built 2018
I 35W over E. LAKE ST
Built 2021
BRT over E LAKE ST
Built 2021
I 35W over E. LAKE ST
Built 2019
MSAS 430 over MIDTOWN GREENWAY
Built 1914
MSAS 211 over MIDTOWN GREENWAY
Built 1997
Bridge Details
- Structure #
- 27V48
- Year Built
- 2021
- Length
- 27.6 m (90.6 ft)
- Max Span
- 26.2 m
- Width
- 38.9 m (127.6 ft)
- Lanes
- 5
- Daily Traffic
- 76,673
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.