MSAS 211 over MIDTOWN GREENWAY
0.1 MI N OF LAKE ST · County 053, Minnesota · Built 1997 · 2 Lanes · 4,900 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
44.950278, -93.270281
This bridge is in worse condition than 16.3% of bridges in County 053. The average bridge in Minnesota is 0 years old; this one is 29 years old.
Nearby Bridges
CSAH 35 over HCRRA
Built 2017
M 766 over MIDTOWN GREENWAY
Built 1915
MSAS 241 over I 35W
Built 2018
I 35W over MIDTOWN GREENWAY TRAIL
Built 2021
I 35W over MIDTOWN GREENWAY TRAIL
Built 2019
CON 711 over MIDTOWN GREENWAY
Built 2021
I 35W over E. LAKE ST
Built 2021
M 2427 over MIDTOWN GREENWAY
Built 1914
CSAH 33 over HCRRA
Built 2006
BRT over E LAKE ST
Built 2021
Bridge Details
- Structure #
- 27A32
- Year Built
- 1997
- Length
- 60.2 m (197.5 ft)
- Max Span
- 22 m
- Width
- 17.8 m (58.4 ft)
- Lanes
- 2
- Daily Traffic
- 4,900
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.