HWY WEBSTER ST over WATER LEESVILLE PD OTLT

.2 MI N AUBURN T.L. · County 027, Massachusetts · Built 1935 · 2 Lanes · 11,567 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
W440151DYMUNNBI
Year Built
1935
Reconstructed
1993
Length
14.3 m (46.9 ft)
Max Span
12.2 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
11,567
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$772,000
Total Project Cost
$1,159,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.