I 290 over WATER KETTLE BROOK

I-290 MM 14.8 · County 027, Massachusetts · Built 1965 · 6 Lanes · 94,134 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
A170521R2DOTNBI
Year Built
1965
Length
8.5 m (27.9 ft)
Max Span
1.8 m
Lanes
6
Daily Traffic
94,134
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,987,000
Total Project Cost
$2,981,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.