HWY FREMONT ST over WATER MIDDLE RIVER

.1 MI W OF EXETER ST · County 027, Massachusetts · Built 1984 · 2 Lanes · 1,871 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W440111DWMUNNBI
Year Built
1984
Length
24.7 m (81 ft)
Max Span
24.1 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
1,871
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,419,000
Total Project Cost
$3,629,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.