ST 12 WEBSTER ST over WATER MIDDLE RIVER

300 FT. WEST OF MILL ST. · County 027, Massachusetts · Built 2013 · 2 Lanes · 10,908 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
W44010BB2DOTNBI
Year Built
2013
Length
19.5 m (64 ft)
Max Span
17 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
10,908
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,060,000
Total Project Cost
$1,591,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.