HWY JAMES ST over RR CSX

.5 MILES N. OF AUBURN T/L · County 027, Massachusetts · Built 2010 · 3 Lanes · 13,910 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
W44022235DOT634
Year Built
2010
Length
33.4 m (109.6 ft)
Max Span
31.4 m
Width
16.9 m (55.4 ft)
Lanes
3
Daily Traffic
13,910
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,285,000
Total Project Cost
$4,928,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.