HWY GRAPEVINE RD over ST128
1.2 MI N.STANDLEY ST. · County 009, Massachusetts · Built 1952 · 2 Lanes · 1,140 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
42.584314, -70.820831
This bridge is in worse condition than 83.6% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 74 years old.
Nearby Bridges
ST128 SB over HWY PINE ST
Built 1953
ST128 NB over HWY PINE ST
Built 1953
HWY STANDLEY ST over ST128
Built 1952
ST 22 ESSEX ST over ST128
Built 1948
HWY HARBOR ST over RR MBTA
Built 1936
HWY WALNUT RD over WATER MILES RIVER
Built 2008
HWY SCHOOL ST over ST128
Built 1952
HWY BRIMBAL AVE over ST128
Built 1948
ST128 over COMB MBTA & TOZER RD
Built 1948
HWY MOULTON ST over WATER MILES RIVER
Built 2000
Bridge Details
- Structure #
- W1600331QDOTNBI
- Year Built
- 1952
- Length
- 38.1 m (125 ft)
- Max Span
- 18.3 m
- Width
- 15.9 m (52.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,140
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,026,000
- Total Project Cost
- $6,040,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.