ST 22 ESSEX ST over ST128

0.2 MI E OF BRIMBAL · County 009, Massachusetts · Built 1948 · 3 Lanes · 20,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B11013309DOTNBI
Year Built
1948
Reconstructed
1985
Length
34 m (111.5 ft)
Max Span
17.1 m
Width
15.6 m (51.2 ft)
Lanes
3
Daily Traffic
20,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,545,000
Total Project Cost
$5,318,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.