ST128 over COMB MBTA & TOZER RD

0.3 MI E OF ST-97/1A · County 009, Massachusetts · Built 1948 · 6 Lanes · 72,449 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B110112TYDOTNBI
Year Built
1948
Reconstructed
1987
Length
36.3 m (119.1 ft)
Max Span
13.7 m
Width
31.1 m (102 ft)
Lanes
6
Daily Traffic
72,449
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,471,000
Total Project Cost
$11,207,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.