HWY BRIMBAL AVE over ST128
AT BRIMBALL AVE · County 009, Massachusetts · Built 1948 · 2 Lanes · 14,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.575183, -70.879125
This bridge is in worse condition than 17.7% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 78 years old.
Nearby Bridges
ST128 over COMB MBTA & TOZER RD
Built 1948
ST128 over ST 1 A/DODGE ST
Built 1946
ST128 over ST 97 CABOT ST
Built 1947
ST 22 ESSEX ST over ST128
Built 1948
HWY SAM FONZO DR over WATER BASS RIVER
Built 1998
HWY STANDLEY ST over ST128
Built 1952
HWY BRIDGE ST over WATER BASS RIVER
Built 1929
HWY SCHOOL ST over RR MBTA
Built 1871
HWY WALNUT RD over WATER MILES RIVER
Built 2008
ST128 over ST 62 ELLIOT ST
Built 1940
Bridge Details
- Structure #
- B1101231XDOTNBI
- Year Built
- 1948
- Reconstructed
- 1990
- Length
- 41.5 m (136.2 ft)
- Max Span
- 20.1 m
- Width
- 14.4 m (47.2 ft)
- Lanes
- 2
- Daily Traffic
- 14,200
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,749,000
- Total Project Cost
- $4,124,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.