HWY SAM FONZO DR over WATER BASS RIVER
0.2 MI W OF ST-97 · County 009, Massachusetts · Built 1998 · 2 Lanes · 2,198 vehicles/day
Overall
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.58175, -70.905417
This bridge is in worse condition than 4% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 28 years old.
Nearby Bridges
ST128 over ST 97 CABOT ST
Built 1947
ST128 over ST 1 A/DODGE ST
Built 1946
ST128 over COMB MBTA & TOZER RD
Built 1948
HWY BRIMBAL AVE over ST128
Built 1948
ST128 over ST 62 ELLIOT ST
Built 1940
ST128 over WATER PORTER RIVER
Built 1941
ST128 over ST 35 HIGH ST
Built 1940
ST128 over RR MBTA/BMRR (ABANDON
Built 2012
ST128 over WATER CRANE RIVER
Built 1940
ST 35 WATER ST over WATER CRANE RIVER
Built 1980
Bridge Details
- Structure #
- B11019BY4MUNNBI
- Year Built
- 1998
- Length
- 7.3 m (24 ft)
- Max Span
- 7.3 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,198
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $412,000
- Total Project Cost
- $619,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.