ST128 over WATER PORTER RIVER

1000 FT N OF ST-35 · County 009, Massachusetts · Built 1941 · 6 Lanes · 73,898 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
D030222U4DOTNBI
Year Built
1941
Length
8.5 m (27.9 ft)
Max Span
7.6 m
Width
28 m (91.9 ft)
Lanes
6
Daily Traffic
73,898
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,636,000
Total Project Cost
$2,455,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.