ST128 over ST 35 HIGH ST

1.3 MI N OF ST-114 · County 009, Massachusetts · Built 1940 · 4 Lanes · 72,449 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
D030212U3DOTNBI
Year Built
1940
Length
23.5 m (77.1 ft)
Max Span
20.1 m
Width
26 m (85.3 ft)
Lanes
4
Daily Traffic
72,449
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,052,000
Total Project Cost
$6,079,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.