ST128 over WATER WATERS RIVER

0.4 MI N OF ST-114 · County 009, Massachusetts · Built 2021 · 6 Lanes · 80,652 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
D030188H7DOTNBI
Year Built
2021
Length
22 m (72.2 ft)
Max Span
21.3 m
Width
29.1 m (95.5 ft)
Lanes
6
Daily Traffic
80,652
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.