ST128 over RR MBTA/BMRR (ABANDON

2 KM NORTH OF ST114 · County 009, Massachusetts · Built 2012 · 4 Lanes · 66,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
D03020AQ8DOTNBI
Year Built
2012
Length
27.8 m (91.2 ft)
Max Span
10.5 m
Width
36.2 m (118.8 ft)
Lanes
4
Daily Traffic
66,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.