ST128 over HWY ACCESS RD

.3 MI S ST114 · County 009, Massachusetts · Built 1958 · 4 Lanes · 18,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
P030212UFDOTNBI
Year Built
1958
Length
21.2 m (69.6 ft)
Max Span
9.7 m
Width
29.9 m (98.1 ft)
Lanes
4
Daily Traffic
18,100
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,271,000
Total Project Cost
$6,407,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.