HWY SCHOOL ST over ST128
.6 MI N MANCHESTER TOWN H · County 009, Massachusetts · Built 1952 · 2 Lanes · 8,650 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
42.590128, -70.765261
This bridge is in worse condition than 83.6% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 74 years old.
Nearby Bridges
ST128 NB over HWY PINE ST
Built 1953
ST128 SB over HWY PINE ST
Built 1953
HWY HARBOR ST over RR MBTA
Built 1936
HWY GRAPEVINE RD over ST128
Built 1952
ST128 over ST133 ESSEX AVE
Built 1948
ST133 MAIN ST over WATER ESSEX RIVER
Built 1970
ST128 over HWY CONCORD ST
Built 1948
HWY CRAFTS RD over ST128
Built 1948
HWY STANDLEY ST over ST128
Built 1952
ST128 over WATER ANNISQUAM RIVER
Built 1950
Bridge Details
- Structure #
- M0201531DDOTNBI
- Year Built
- 1952
- Length
- 35.9 m (117.8 ft)
- Max Span
- 17.2 m
- Width
- 14.9 m (48.9 ft)
- Lanes
- 2
- Daily Traffic
- 8,650
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,929,000
- Total Project Cost
- $10,394,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.