ST128 over HWY CONCORD ST

.7 MI N ST133 · County 009, Massachusetts · Built 1948 · 6 Lanes · 90,905 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
G050212U7DOTNBI
Year Built
1948
Length
18.6 m (61 ft)
Max Span
17.7 m
Width
28 m (91.9 ft)
Lanes
6
Daily Traffic
90,905
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,454,000
Total Project Cost
$5,182,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.