ST128 over HWY MARSH ST

.3 MI S OF WASHINGTON CIR · County 009, Massachusetts · Built 1948 · 4 Lanes · 35,677 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
G050222U9DOTNBI
Year Built
1948
Length
14 m (45.9 ft)
Max Span
13.1 m
Width
26.9 m (88.3 ft)
Lanes
4
Daily Traffic
35,677
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,620,000
Total Project Cost
$3,931,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.