HWY GLOUCESTR AV over RR MBTA

.1 MI S ST128 · County 009, Massachusetts · Built 1861 · 2 Lanes · 2,200 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
G05016327DOT634
Year Built
1861
Length
10.7 m (35.1 ft)
Max Span
7.9 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
2,200
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,200,000
Total Project Cost
$1,801,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.