HWY CRAFTS RD over ST128
.48 KM S ANNISQUAM RIV · County 009, Massachusetts · Built 1948 · 2 Lanes · 628 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.625592, -70.695556
This bridge is in worse condition than 17.7% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 78 years old.
Nearby Bridges
ST128 over WATER ANNISQUAM RIVER
Built 1950
ST128 over HWY CONCORD ST
Built 1948
ST128 over HWY MARSH ST
Built 1948
HWY CENTNNIAL AV over RR MBTA
Built 1850
ST128 over HWY MAPLEWOOD AVE
Built 1959
ST128 over ST133 ESSEX AVE
Built 1948
ST127 WESTERN AVE over WATER BLYNMAN CANAL
Built 1906
ST128 over RR MBTA
Built 1950
HWY GLOUCESTR AV over RR MBTA
Built 1861
ST127 WASHNGTON ST over WATER GOOSE COVE
Built 1952
Bridge Details
- Structure #
- G0502030QDOTNBI
- Year Built
- 1948
- Reconstructed
- 2004
- Length
- 26.5 m (86.9 ft)
- Max Span
- 25.1 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 628
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,062,000
- Total Project Cost
- $3,094,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.