HWY MOULTON ST over WATER MILES RIVER
.4K E. OF ST 1A · County 009, Massachusetts · Built 2000 · 2 Lanes · 1,293 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.633744, -70.840294
This bridge is in worse condition than 4% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 26 years old.
Nearby Bridges
HWY CUTLER RD over RR MBTA
Built 2004
HWY WALDNGFLD RD over RR MBTA
Built 1927
ST 1 A/COUNTY RD over WATER MILES RIVER
Built 1952
HWY HIGHLAND ST over WATER IPSWICH RIVER
Built 1833
HWY WALNUT RD over WATER MILES RIVER
Built 2008
HWY WINTHROP ST over WATER IPSWICH RIVER
Built 1845
HWY COUNTY ST over WATER IPSWICH RIVER
Built 1861
HWY COUNTY ST over WATER IPSWICH RIVER
Built 1861
ST133 MAIN ST over WATER ESSEX RIVER
Built 1970
ST 1 A/S MAIN ST over WATER IPSWICH RIVER
Built 1764
Bridge Details
- Structure #
- H030048NFMUNNBI
- Year Built
- 2000
- Length
- 11.3 m (37.1 ft)
- Max Span
- 10.4 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,293
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,048,000
- Total Project Cost
- $1,573,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.