HWY MOULTON ST over WATER MILES RIVER

.4K E. OF ST 1A · County 009, Massachusetts · Built 2000 · 2 Lanes · 1,293 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H030048NFMUNNBI
Year Built
2000
Length
11.3 m (37.1 ft)
Max Span
10.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
1,293
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,048,000
Total Project Cost
$1,573,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.