ST146 NB over HWY LACKEY DAM RD

1 MI. N. OF HARTFORD AVE · County 027, Massachusetts · Built 1950 · 2 Lanes · 18,950 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
U020401MVDOTNBI
Year Built
1950
Reconstructed
1983
Length
28.3 m (92.8 ft)
Max Span
24.7 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
18,950
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,320,000
Total Project Cost
$1,981,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.