ST146 NB over HWY MAIN ST
100 FT N. OF SUTTON TL · County 027, Massachusetts · Built 1950 · 2 Lanes · 18,954 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
42.101589, -71.703869
This bridge is in worse condition than 30.9% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 76 years old.
Nearby Bridges
ST146 SB over HWY MAIN ST
Built 1982
HWY LACKEY DAM R over WATER MUMFORD RIVER
Built 1982
ST146 NB over HWY MENDON RD
Built 1950
ST146 SB over HWY MENDON RD
Built 1982
ST146 NB over HWY LACKEY DAM RD
Built 1950
HWY MAIN ST over WATER WHITINS POND
Built 1971
ST146 SB over HWY LACKEY DAM RD
Built 1983
ST146 NB over WATER MUMFORD RIVER
Built 2022
ST146 SB over WATER MUMFORD RIVER
Built 1983
HWY NORTH ST over WATER MUMFORD RIVER
Built 1869
Bridge Details
- Structure #
- N210141MJDOTNBI
- Year Built
- 1950
- Reconstructed
- 2006
- Length
- 36 m (118.1 ft)
- Max Span
- 16.5 m
- Width
- 14.4 m (47.2 ft)
- Lanes
- 2
- Daily Traffic
- 18,954
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $692,000
- Total Project Cost
- $1,039,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.