HWY LACKEY DAM R over WATER MUMFORD RIVER

1 MI.EST.OF ST.146 · County 027, Massachusetts · Built 1982 · 2 Lanes · 9,170 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
S330011DFMUNNBI
Year Built
1982
Length
17.7 m (58.1 ft)
Max Span
17.4 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
9,170
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,010,000
Total Project Cost
$1,516,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.