HWY NORTH ST over WATER MUMFORD RIVER

AT JCT GILBOA ST · County 027, Massachusetts · Built 1869 · 2 Lanes · 8,166 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
D090011BBMUNNBI
Year Built
1869
Length
10.4 m (34.1 ft)
Max Span
10.4 m
Width
6.9 m (22.6 ft)
Lanes
2
Daily Traffic
8,166
Material
Masonry
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,213,000
Total Project Cost
$3,320,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.