HWY COOK ST over WATER MUMFORD RIVER
BETW RT16&GILBOA ST · County 027, Massachusetts · Built 1995 · 2 Lanes · 1,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.0743, -71.712561
This bridge is in worse condition than 30.9% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 31 years old.
Nearby Bridges
HWY MECHANIC ST over WATER MUMFORD RIVER
Built 1873
HWY NORTH ST over WATER MUMFORD RIVER
Built 1869
HWY WEST ST over WATER RIDDLE BROOK
Built 1956
HWY MANCHAUG ST over WATER MUMFORD RIVER
Built 1947
HWY POTTER RD over WATER MUMFORD RIVER
Built 1850
ST146 SB over WATER MUMFORD RIVER
Built 1983
ST146 NB over WATER MUMFORD RIVER
Built 2022
ST146 SB over HWY LACKEY DAM RD
Built 1983
ST146 NB over HWY LACKEY DAM RD
Built 1950
HWY W HARTFRD AV over ST146 SB
Built 1983
Bridge Details
- Structure #
- D090061FBMUNNBI
- Year Built
- 1995
- Length
- 23.5 m (77.1 ft)
- Max Span
- 22.9 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,500
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,506,000
- Total Project Cost
- $3,760,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.