HWY W HARTFRD AV over ST146 NB

1MI.NTH.OF ST-16 · County 027, Massachusetts · Built 1950 · 2 Lanes · 3,556 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
U020431YKDOTNBI
Year Built
1950
Reconstructed
1983
Length
31.7 m (104 ft)
Max Span
15.2 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
3,556
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,847,000
Total Project Cost
$4,271,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.