ST146 NB over ST 16 DOUGLAS ST

2 MILES WEST OF ST-122 · County 027, Massachusetts · Built 1950 · 2 Lanes · 16,652 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
U020461MTDOTNBI
Year Built
1950
Length
15.2 m (49.9 ft)
Max Span
12.8 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
16,652
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,475,000
Total Project Cost
$2,213,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.