ST122 N MAIN ST over WATER MUMFORD RIVER
.1 MI N OF HRTFD AV · County 027, Massachusetts · Built 1952 · 2 Lanes · 11,191 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.092242, -71.643144
This bridge is in worse condition than 30.9% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 74 years old.
Nearby Bridges
HWY HARTFORD AVE over WATER MUMFORD RIVER
Built 1955
ST122 PROVDENCE RD over RR PWRR
Built 1960
HWY LINWOOD AVE over WATER LINWOOD POND
Built 1923
HWY HOMEWARD AVE over RR PWRR
Built 1983
HWY HARTFORD AVE over WATER BLACKSTONE CANAL
Built 1870
ST122 PROVDENCE RD over RR PWRR
Built 1941
HWY HARTFORD AVE over WATER BLACKSTONE RIVER
Built 1900
ST 16 MENDON ST over WATER MUMFORD RIVER
Built 1900
ST 16 MENDON ST over WATER BLACKSTONE RIVER
Built 1954
HWY DEPOT ST over WATER MUMFORD RIVER
Built 1994
Bridge Details
- Structure #
- U020211L9DOTNBI
- Year Built
- 1952
- Length
- 17.1 m (56.1 ft)
- Max Span
- 16.2 m
- Width
- 16.2 m (53.1 ft)
- Lanes
- 2
- Daily Traffic
- 11,191
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,894,000
- Total Project Cost
- $2,842,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.