ST122 N MAIN ST over WATER MUMFORD RIVER

.1 MI N OF HRTFD AV · County 027, Massachusetts · Built 1952 · 2 Lanes · 11,191 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
U020211L9DOTNBI
Year Built
1952
Length
17.1 m (56.1 ft)
Max Span
16.2 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
11,191
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,894,000
Total Project Cost
$2,842,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.