HWY DEPOT ST over WATER MUMFORD RIVER

0.1M E JCT RTS 16 & 122 · County 027, Massachusetts · Built 1994 · 2 Lanes · 260 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
U020081J2MUNNBI
Year Built
1994
Length
24.7 m (81 ft)
Max Span
22.9 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
260
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,737,000
Total Project Cost
$2,606,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.