ST122 MAIN ST over WATER BLACKSTONE RIVER

2.2MI.NTH OF MILLVILLE TL · County 027, Massachusetts · Built 2012 · 2 Lanes · 4,318 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
U02001B9NDOTNBI
Year Built
2012
Length
35.5 m (116.5 ft)
Max Span
34.1 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
4,318
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$730,000
Total Project Cost
$1,096,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.