ST146 NB over ST 98 ALDRICH ST

MM2.6 0.1 MI W OF ST146A · County 027, Massachusetts · Built 1984 · 3 Lanes · 29,065 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
U020541N0DOTNBI
Year Built
1984
Length
28.5 m (93.5 ft)
Max Span
26.5 m
Width
14 m (45.9 ft)
Lanes
3
Daily Traffic
29,065
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,531,000
Total Project Cost
$3,797,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.