ST146 SB over ST 98 ALDRICH ST

MM2.6 0.1 MI W OF ST146A · County 027, Massachusetts · Built 1984 · 2 Lanes · 13,844 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
U020541N1DOTNBI
Year Built
1984
Length
28.7 m (94.2 ft)
Max Span
25.9 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
13,844
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,238,000
Total Project Cost
$1,858,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.