ST146 SB over COMB CHOCLG RD&EMRSN BK
MM 3 2.6 MI S OF ST-16 · County 027, Massachusetts · Built 1984 · 2 Lanes · 16,960 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.046164, -71.628097
This bridge is in worse condition than 30.9% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 42 years old.
Nearby Bridges
ST146 NB & RAMP C over COMB CHOCLG RD&EMRSN BK
Built 1984
ST146 SB OFF RAMP over WATER EMERSON BROOK
Built 1984
HWY MILL ST over ST146
Built 1984
ST146 NB over ST 98 ALDRICH ST
Built 1984
ST146 SB over ST 98 ALDRICH ST
Built 1984
ST122 MAIN ST over WATER BLACKSTONE RIVER
Built 2012
ST122 MLLVLLE RD over RR PWRR
Built 1955
HWY POND ST over ST146 SB
Built 1983
HWY POND ST over ST146 NB
Built 1950
ST146 NB over HWY ELMWOOD AVE
Built 1984
Bridge Details
- Structure #
- U020531MYDOTNBI
- Year Built
- 1984
- Length
- 70.1 m (230 ft)
- Max Span
- 34.4 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 16,960
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $632,000
- Total Project Cost
- $949,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.