HWY POND ST over ST146 SB
1.2 MI. N. OF MILL ST. · County 027, Massachusetts · Built 1983 · 2 Lanes · 500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.060136, -71.650617
This bridge is in worse condition than 30.9% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 43 years old.
Nearby Bridges
HWY POND ST over ST146 NB
Built 1950
ST146 NB over ST 16 DOUGLAS ST
Built 1950
ST146 SB over ST 16 DOUGLAS ST
Built 1983
HWY MILL ST over ST146
Built 1984
ST146 SB OFF RAMP over WATER EMERSON BROOK
Built 1984
ST146 SB over COMB CHOCLG RD&EMRSN BK
Built 1984
ST146 NB & RAMP C over COMB CHOCLG RD&EMRSN BK
Built 1984
ST 16 MENDON ST over WATER MUMFORD RIVER
Built 1900
HWY DEPOT ST over WATER MUMFORD RIVER
Built 1994
HWY HOMEWARD AVE over RR PWRR
Built 1983
Bridge Details
- Structure #
- U02063211DOTNBI
- Year Built
- 1983
- Length
- 52.7 m (172.9 ft)
- Max Span
- 35.4 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,560,000
- Total Project Cost
- $3,841,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.