HWY HARTFORD AVE over WATER BLACKSTONE CANAL

200 FT E OF OAK ST · County 027, Massachusetts · Built 1870 · 2 Lanes · 7,627 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
U020191DKMUNNBI
Year Built
1870
Length
18.3 m (60 ft)
Max Span
18.3 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
7,627
Material
Masonry
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$889,000
Total Project Cost
$1,334,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.