HWY HARTFORD AVE over WATER BLACKSTONE RIVER

400 FT. EAST OF OAK ST · County 027, Massachusetts · Built 1900 · 2 Lanes · 7,627 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
U020181DLMUNNBI
Year Built
1900
Reconstructed
1960
Length
11.9 m (39 ft)
Max Span
11.9 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
7,627
Material
Masonry
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,365,000
Total Project Cost
$2,048,000