HWY HARTFORD AVE over WATER MUMFORD RIVER
.4 MI E OF RTE 122 · County 027, Massachusetts · Built 1955 · 2 Lanes · 7,627 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.092906, -71.636714
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 71 years old.
Nearby Bridges
ST122 N MAIN ST over WATER MUMFORD RIVER
Built 1952
ST122 PROVDENCE RD over RR PWRR
Built 1960
HWY HOMEWARD AVE over RR PWRR
Built 1983
HWY LINWOOD AVE over WATER LINWOOD POND
Built 1923
HWY HARTFORD AVE over WATER BLACKSTONE CANAL
Built 1870
HWY HARTFORD AVE over WATER BLACKSTONE RIVER
Built 1900
ST122 PROVDENCE RD over RR PWRR
Built 1941
ST 16 MENDON ST over WATER MUMFORD RIVER
Built 1900
ST 16 MENDON ST over WATER BLACKSTONE RIVER
Built 1954
HWY DEPOT ST over WATER MUMFORD RIVER
Built 1994
Bridge Details
- Structure #
- U020201DMMUNNBI
- Year Built
- 1955
- Length
- 14.9 m (48.9 ft)
- Max Span
- 14 m
- Width
- 11.8 m (38.7 ft)
- Lanes
- 2
- Daily Traffic
- 7,627
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,150,000
- Total Project Cost
- $1,726,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.