ST 32 STONE ST over RR CSX

300 S JCT US20/PARK ST · County 013, Massachusetts · Built 1892 · 2 Lanes · 6,541 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P010201ANDOT634
Year Built
1892
Reconstructed
1991
Length
28.8 m (94.5 ft)
Max Span
27.7 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
6,541
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,356,000
Total Project Cost
$2,035,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.