I 90 EXIT 63 RAMP over HWY SHEARER ST

AT ST 32 & 181 H7 · County 013, Massachusetts · Built 1957 · 2 Lanes · 17,715 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P010514MGDOTNBI
Year Built
1957
Reconstructed
1982
Length
17.1 m (56.1 ft)
Max Span
15.7 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
17,715
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,814,000
Total Project Cost
$2,722,000