HWY PALMER RD over WATER QUABOAG RIVER

JUST W OF RTE 181 · County 013, Massachusetts · Built 1957 · 2 Lanes · 4,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P01006161MUNNBI
Year Built
1957
Length
43.9 m (144 ft)
Max Span
21.1 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
4,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,886,000
Total Project Cost
$4,330,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.