I 90 WB over WATER QUABOAG RIVER

MM 61.8 ON I-90 WB · County 013, Massachusetts · Built 1957 · 2 Lanes · 31,621 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P010464MNDOTNBI
Year Built
1957
Reconstructed
1991
Length
147.8 m (484.9 ft)
Max Span
27.4 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
31,621
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$692,000
Total Project Cost
$1,039,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.