I 90 EXIT 63 RAMP over I 90
MM 62.6 ON I-90 · County 013, Massachusetts · Built 1957 · 2 Lanes · 9,799 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
42.172397, -72.331789
This bridge is in worse condition than 56.9% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
I 90 EXIT 63 RAMP over HWY SHEARER ST
Built 1957
I 90 EB over ST 32 THORNDIKE ST
Built 1957
I 90 WB over ST 32 THORNDIKE ST
Built 1957
I 90 WB over ST181 N MAIN ST
Built 1957
I 90 EB over ST181 N MAIN ST
Built 1957
HWY PALMER RD over WATER QUABOAG RIVER
Built 1957
I 90 WB over RR NECRR & MCRR
Built 1957
I 90 EB over RR NECRR & MCRR
Built 1957
I 90 WB over WATER QUABOAG RIVER
Built 1957
HWY BRCKNRDGE ST over I 90
Built 1957
Bridge Details
- Structure #
- P010504MFDOTNBI
- Year Built
- 1957
- Reconstructed
- 1988
- Length
- 62.7 m (205.7 ft)
- Max Span
- 18.8 m
- Width
- 15.8 m (51.8 ft)
- Lanes
- 2
- Daily Traffic
- 9,799
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,483,000
- Total Project Cost
- $9,725,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.